• Project Application Form

    Please be prepared to pay plan review fees of $156.00-$312.00 at the end of your application unless you qualify as a tax exempt entity i.e 501c/503c (Do Not use this application for Special Events! Exit and use the link to Obtain A Special Event Permit)
  • Date*
     - -
    2 digit month, 2 digit day, 4 digit year
  • Format: (000) 000-0000.
  • ***If you wish to have additional contacts receive communications from Truckee Fire regarding plan review, please list their email(s) below***

  • Project Location

  • Project County*
  • Project

  • Project Type*
  • Residential Plan Review Application

  • Project Type*
  • New Construction

  • Living * Garage * Storage/Basement   *   Deck/Porch   *   Other   *   

  • Fire Sprinklers 
    Within Placer County Plans need to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

    Within the Town of Truckee fire sprinkler & fire alarm projects must be permitted by the Town of Truckee Building and Safety Division.

    Within Nevada County fire sprinkler & fire alarm projects must be permitted by Nevada County Building Department  

  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • Placer County: upload your Permit Issuance Checklist along with your plans.
    Nevada County: upload your Preliminary Building Permit along with your plans.
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

  • Truckee Fire Notes section on plans including the following TFPD Ordinances:

    503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 15 feet (4572 mm). Driveways shall have an unobstructed width of not less than 12 feet (3658 mm).

    503.2.5 Dead ends. Dead-end fire apparatus access roads and driveways in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus.

    If permit includes a generator or open flame device include the following:

    308.1.9 Outdoor Open Flame Appliances. Outdoor open flame appliances, including permanently installed outdoor fireplaces, fire pits, BBQ’s, pizza ovens and any other open flame outdoor device that is connected to a residential or commercial gas line service shall be installed in accordance with the following:
    All parts/assemblies to be tested and certified by UL, CSA, or ANSI.
    A gas shut-off valve located shall be installed at the stub out and provided with ready access.
    A second gas shut-off valve shall be located within 3 feet (9115 mm) to 5 feet (1524 mm) of device where the primary shut-off valve is further than 6 feet (1829 mm) from the appliance.
    The appliance shall include a timer device which allows a maximum operating time of three hours. The timer shall require a manual reset.
    A separation distance of 10 feet (3048 mm) feet vertically and horizontally shall be provided to all combustible materials, not including the support structure. The separation distance shall be measured from the open flame.
    Exception: Where approved by the Fire Code Official, the separation distance can be reduced provided the manufacturer’s installation guidelines specify a lesser distance to combustible materials.
    The surface supporting the appliance shall be of an ignition-resistant or fire-resistant material for a distance of 2 feet (610 mm) in all directions from the appliance.
    The appliance shall produce a maximum flame height of 2 feet (610 mm).

    509.2.1 Electrical Shunt Trip/Switch. New structures and remodeled structures shall be provided with a remote main power electrical shunt switch in an approved location where any of the following conditions occur:
    The main power disconnect switch is located on the interior of a building,
    The main power disconnect switch is inaccessible to fire department personnel due to location or to climatic conditions, or
    The facility is equipped with multiple electrical sources, such as fuel cells, ESS, generators or solar photovoltaic systems.
    Exception: Facilities where the Fire Code Official determines the electrical shunt trip/switch is not required.
    The remote main power electrical shunt trip/switch shall be hard wired to all power sources. The electrical shunt trip/switch shall be installed on the exterior of the building in an location approved by the Fire Code Official and protected from the elements. The electrical shunt trip/switch shall have an approved, permanent, weatherproof sign which states “MAIN POWER SHUNT TRIP/SWITCH”.

    1203.1.3 Installation. Emergency power systems and standby power systems shall be installed in accordance with the California Building Code, NFPA 70, NFPA 110 and NFPA 111. Where emergency or standby power is provided at a structure, an electrical shunt trip/switch shall be provided in accordance with Section 509.2.1.

    1203.7 Protection from horizontal impact. Fuel piping to generators shall be protected from damage where underground fuel piping extends above ground and is located in an area subject to the horizontal movement of snow. The barrier or method of protection shall be approved by the Fire Code Official.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Demo/Rebuild

  • Is the building currently sprinklered?*
  • Is the project adding 50% or more of the existing square footage? If yes, move on to next question. If no, sprinklers are not required*
  • Does the additional square footage equal 2,000 sq. ft. or more? If yes, sprinklers are required. If no, sprinkler retrofit is not required.*
  • Do alterations involve removal, demolition or repair of more than 50% of the exterior load-bearing walls or 50% of the interior floor square footage? If yes, sprinklers are required. If no, sprinklers are not required.*
  • Existing conditioned area
       

  • How much new conditioned space/floor is being added?
       

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • How much new unconditioned floor/area is being added?
    Garage Storage/Basement      Deck/Porch      Other      

  • What is the square footage being demoed?
    Living Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers

    Within Placer County Plans need to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400

    Within the Town of Truckee fire sprinkler & fire alarm projects must be permitted by the Town of Truckee Building and Safety Division.

    Within Nevada County fire sprinkler & fire alarm projects must be permitted by Nevada County Building Department.

  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • Placer County: submit your Permit Issuance Checklist.
    Nevada County: submit your Preliminary Building Permit.
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

  • Truckee Fire Notes section on plans including the following TFPD Ordinances:

    503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 15 feet (4572 mm). Driveways shall have an unobstructed width of not less than 12 feet (3658 mm).

    503.2.5 Dead ends. Dead-end fire apparatus access roads and driveways in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus.

    If permit includes an open flame device include the following:

    308.1.9 Outdoor Open Flame Appliances. Outdoor open flame appliances, including permanently installed outdoor fireplaces, fire pits, BBQ’s, pizza ovens and any other open flame outdoor device that is connected to a residential or commercial gas line service shall be installed in accordance with the following:
    All parts/assemblies to be tested and certified by UL, CSA, or ANSI.
    A gas shut-off valve located shall be installed at the stub out and provided with ready access.
    A second gas shut-off valve shall be located within 3 feet (9115 mm) to 5 feet (1524 mm) of device where the primary shut-off valve is further than 6 feet (1829 mm) from the appliance.
    The appliance shall include a timer device which allows a maximum operating time of three hours. The timer shall require a manual reset.
    A separation distance of 10 feet (3048 mm) feet vertically and horizontally shall be provided to all combustible materials, not including the support structure. The separation distance shall be measured from the open flame.
    Exception: Where approved by the Fire Code Official, the separation distance can be reduced provided the manufacturer’s installation guidelines specify a lesser distance to combustible materials.
    The surface supporting the appliance shall be of an ignition-resistant or fire-resistant material for a distance of 2 feet (610 mm) in all directions from the appliance.
    The appliance shall produce a maximum flame height of 2 feet (610 mm).

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Remodel/Addition

  • Is the building currently sprinklered?*
  • Is the project adding 50% or more of the existing square footage? If yes, move on to next question. If no, sprinklers are not required.*
  • Does the additional square footage equal 2,000 sq. ft. or more? If yes, sprinklers are required. If no, sprinkler retrofit is not required.*
  • Existing conditioned space/floor area
       

  • How much new conditioned space/floor is being added
       

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • How much new unconditioned floor/area is being added
    Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers

    Within Placer County Plans need to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400

    Within the Town of Truckee fire sprinkler & fire alarm projects must be permitted by the Town of Truckee Building and Safety Division.

    Within Nevada County fire sprinkler & fire alarm projects must be permitted by Nevada County Building Department.

  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • Placer County: submit your Permit Issuance Checklist.
    Nevada County: submit your Preliminary Building Permit.
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

  • Truckee Fire Notes section on plans including the following TFPD Ordinances:

    503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 15 feet (4572 mm). Driveways shall have an unobstructed width of not less than 12 feet (3658 mm).

    503.2.5 Dead ends. Dead-end fire apparatus access roads and driveways in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus.

    If permit includes a generator or open flame device include the following:

    308.1.9 Outdoor Open Flame Appliances. Outdoor open flame appliances, including permanently installed outdoor fireplaces, fire pits, BBQ’s, pizza ovens and any other open flame outdoor device that is connected to a residential or commercial gas line service shall be installed in accordance with the following:
    All parts/assemblies to be tested and certified by UL, CSA, or ANSI.
    A gas shut-off valve located shall be installed at the stub out and provided with ready access.
    A second gas shut-off valve shall be located within 3 feet (9115 mm) to 5 feet (1524 mm) of device where the primary shut-off valve is further than 6 feet (1829 mm) from the appliance.
    The appliance shall include a timer device which allows a maximum operating time of three hours. The timer shall require a manual reset.
    A separation distance of 10 feet (3048 mm) feet vertically and horizontally shall be provided to all combustible materials, not including the support structure. The separation distance shall be measured from the open flame.
    Exception: Where approved by the Fire Code Official, the separation distance can be reduced provided the manufacturer’s installation guidelines specify a lesser distance to combustible materials.
    The surface supporting the appliance shall be of an ignition-resistant or fire-resistant material for a distance of 2 feet (610 mm) in all directions from the appliance.
    The appliance shall produce a maximum flame height of 2 feet (610 mm).

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Commercial Plan Review Application

  • Project Type*
  • New Construction

  • Living * Garage * Storage/Basement   *   Deck/Porch   *   Other   *   

  • Fire Sprinklers 
    Commercial sprinkler plans in Placer County, Nevada County and Town of Truckee to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Placer County: submit your Permit Issuance Checklist. 

    Nevada County: submit your Preliminary Building Permit. 

    Town of Truckee:

    • For residential no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.
    • For commercial projects please upload your Non-residential/Tenant Improvement Permit Request that includes your square footage breakdown (industrial, commercial, and office).

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

    The developer is required to comply with the Fire District’s interpretation of the fire code as  the authority having jurisdiction.  Some typical interpretations include: providing Knox key box access for building control rooms and gates, providing markers, snow removal, and vehicle impact protection for fire hydrants, providing and maintaining pre-fire safety plans for Fire District use and, limiting vertical combustible construction prior to completion of an emergency water supply. 

    The developer is required to comply with the Fire District’s currently adopted defensible space ordinance throughout the life of the project. The Zone 0 “ignition resistant zone” will be in effect after January 1st 2023 for new construction and January 1st 2024 for existing construction.  A vegetation management plan that addresses the creation and continued maintenance of defensible space around the project area will be required. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Demo/Rebuild

  • Will there be a change in occupancy type?*
  • If yes, what is the current occupancy type? What will the new occupancy type be?
    * *

  • Is the building currently sprinklered?*
  • Existing conditioned space/floor area
       

  • How much new conditioned space/floor is being added?
       

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • If demo, what is the square footage being demoed
    Living      Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers 
    Commercial sprinkler plans in Placer County, Nevada County and Town of Truckee to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Placer County: submit your Permit Issuance Checklist. 
    Nevada County: submit your Preliminary Building Permit. 
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

    The developer is required to comply with the Fire District’s interpretation of the fire code as  the authority having jurisdiction.  Some typical interpretations include: providing Knox key box access for building control rooms and gates, providing markers, snow removal, and vehicle impact protection for fire hydrants, providing and maintaining pre-fire safety plans for Fire District use and, limiting vertical combustible construction prior to completion of an emergency water supply. 

    The developer is required to comply with the Fire District’s currently adopted defensible space ordinance throughout the life of the project. The Zone 0 “ignition resistant zone” will be in effect after January 1st 2023 for new construction and January 1st 2024 for existing construction.  A vegetation management plan that addresses the creation and continued maintenance of defensible space around the project area will be required. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Remodel/Addition

  • Will there be a change in occupancy type?*
  • If yes, what is the current occupancy type? What will the new occupancy type be?
    * *

  • Is the building currently sprinklered?*
  • Existing conditioned space/floor area
       

  • How much new conditioned space/floor is being added?  
         

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • How much new unconditioned floor/area is being added?
    Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers 
    Commercial sprinkler plans in Placer County, Nevada County and Town of Truckee to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Placer County: submit your Permit Issuance Checklist. 
    Nevada County: submit your Preliminary Building Permit. 
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

    The developer is required to comply with the Fire District’s interpretation of the fire code as  the authority having jurisdiction.  Some typical interpretations include: providing Knox key box access for building control rooms and gates, providing markers, snow removal, and vehicle impact protection for fire hydrants, providing and maintaining pre-fire safety plans for Fire District use and, limiting vertical combustible construction prior to completion of an emergency water supply. 

    The developer is required to comply with the Fire District’s currently adopted defensible space ordinance throughout the life of the project. The Zone 0 “ignition resistant zone” will be in effect after January 1st 2023 for new construction and January 1st 2024 for existing construction.  A vegetation management plan that addresses the creation and continued maintenance of defensible space around the project area will be required. 

  • Remodel/Addition

  • Will there be a change in occupancy type?*
  • If yes, what is the current occupancy type? What will the new occupancy type be?
    * *

  • Is the building currently sprinklered?*
  • Existing conditioned space/floor area
       

  • How much new conditioned space/floor is being added?
       

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • How much new unconditioned floor/area is being added?
    Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers 
    Commercial sprinkler plans in Placer County, Nevada County and Town of Truckee to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.  

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Placer County: submit your Permit Issuance Checklist. 
    Nevada County: submit your Preliminary Building Permit. 
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

    The developer is required to comply with the Fire District’s interpretation of the fire code as  the authority having jurisdiction.  Some typical interpretations include: providing Knox key box access for building control rooms and gates, providing markers, snow removal, and vehicle impact protection for fire hydrants, providing and maintaining pre-fire safety plans for Fire District use and, limiting vertical combustible construction prior to completion of an emergency water supply. 

    The developer is required to comply with the Fire District’s currently adopted defensible space ordinance throughout the life of the project. The Zone 0 “ignition resistant zone” will be in effect after January 1st 2023 for new construction and January 1st 2024 for existing construction.  A vegetation management plan that addresses the creation and continued maintenance of defensible space around the project area will be required. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Converting/Change of Occupancy Type

  • Will there be a change in occupancy type?*
  • If yes, what is the current occupancy type? What will the new occupancy type be?
    * *

  • Is the building currently sprinklered?*
  • Existing conditioned space/floor area
       

  • How much new conditioned space/floor is being added?
       

  • Existing unconditioned space/floor area
    Garage Storage/Basement      Deck/Porch      Other      

  • How much new unconditioned floor/area is being added?
    Garage Storage/Basement      Deck/Porch      Other      

  • What is the total square footage being converted?
    Living Garage Storage/Basement      Deck/Porch      Other      

  • Fire Sprinklers 
    Within Placer County Plans need to be submitted to the District’s third-party contractor, Engineered Fire Systems, Inc., for review and scheduled inspections.

    Contact information: 
    Engineered Fire Systems (EFS)
    11832 Tammy Way 
    Grass Valley, Ca. 95949 
    530.274.9400 

    Within the Town of Truckee fire sprinkler & fire alarm projects must be permitted by the Town of Truckee Building and Safety Division.

    Within Nevada County fire sprinkler & fire alarm projects must be permitted by Nevada County Building Department  

  • Review the statements below. Check the boxes once the statements have been reviewed.*
  • The complete set of plans/submittal must include the following. Check the following requirements to ensure all are met prior to submitting.*
  • Placer County: submit your Permit Issuance Checklist. 
    Nevada County: submit your Preliminary Building Permit. 
    Town of Truckee: no submission required. Fees will be collected by the Town of Truckee upon the issuance of your permit.

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please allow 3 business days (excluding holidays) for our staff to calculate the Fire Impact/Mitigation fees.  We will respond to you via email. We accept all major credit/debit cards, however a 3.5% credit card fee applies, or personal checks which can be mailed to: Truckee Fire District PO Box 2768 Truckee, CA 96160 or dropped off at our office located at 10049 Donner Pass Rd Truckee, CA 96161.

    Once the plans are reviewed/approved AND all plan review/mitigation fees have been paid, TFD will sign-off the workflow in the Placer County/Town of Truckee system for permit issuance.  We will add any required inspections due prior to your final occupancy permit. 

    Mitigation fees will need to be paid prior to permit issuance.

    The developer is required to comply with the Fire District’s interpretation of the fire code as  the authority having jurisdiction.  Some typical interpretations include: providing Knox key box access for building control rooms and gates, providing markers, snow removal, and vehicle impact protection for fire hydrants, providing and maintaining pre-fire safety plans for Fire District use and, limiting vertical combustible construction prior to completion of an emergency water supply. 

    The developer is required to comply with the Fire District’s currently adopted defensible space ordinance throughout the life of the project. The Zone 0 “ignition resistant zone” will be in effect after January 1st 2023 for new construction and January 1st 2024 for existing construction.  A vegetation management plan that addresses the creation and continued maintenance of defensible space around the project area will be required. 

    If your project involves the installation of Solar/ESS, Generator, or Propane, a separate plan review and field inspections are required for these systems. Click the link that pertains to your project for more information.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Occupancy Type*
  • Project Type*
  • What is the scope of this project?*
  • Check the requirements to ensure all are met prior to submitting*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • First Stage Regulator and Piping*
  • Secondary Regulator Information*
  • Anode Bags Installed:
  • Installation Type*
  • Project Type*
  • Occupancy Type*
  • Check the requirements to ensure all are met prior to submitting
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Read & Acknowledge The Following:*
  • Date*
     - -
    2 digit month, 2 digit day, 4 digit year
  • Format: (000) 000-0000.
  • Occupancy Type*
  • Check the requirements to ensure all are met prior to submitting*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Event End Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Time
  • Nature of Event
  • Venue
  • Tents (larger than 20x20 feet)
  • Food and Beverage
  • Security
  • Emergency Medical
  • Is an ambulance stand-by required?
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Fire Protection
  • Date*
     - -
    2 digit month, 2 digit day, 4 digit year
  • My Products*

    prevnext( X )
    Commercial Plan Review Fee Product Image
    Commercial Plan Review Fee
    $312.00$312.00
      
    Residential Plan Review Fee  Product Image
    Residential Plan Review Fee
    $156.00$156.00
      
    Total
    $0.00$0.00
  • Payment Methods